कौन ज़िम्मेदार? KaunZimmedar

Maintenance of existing road section from Churachandpur to Tipaimukh of NH-02 from Km 70.00 to Km 185.00 in the State of Manipur, on item-rate and work-order basis, under risk and cost of the EPC Contractor. (4th Call)

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Document details
Official titleMaintenance of existing road section from Churachandpur to Tipaimukh of NH-02 from Km 70.00 to Km 185.00 in the State of Manipur, on item-rate and work-order basis, under risk and cost of the EPC Contractor. (4th Call)
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number2026_NHIDC_915779_1
Statusclosed (archive)
Year2026
Closing date13-07-2026
Documents0

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →