Nat’l Highways Infra Dev Corp
NHIDCL to spend ₹11.8 crore on 12.6 km road upgrade in West Bengal
The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting the construction and upgradation of a 12.60 km section of National Highway 717A in West Bengal, from Bagrakot to Kafer (km 13.00 to km 25.600)…
The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting the construction and upgradation of a 12.60 km section of National Highway 717A in West Bengal, from Bagrakot to Kafer (km 13.00 to km 25.600), to a 2-lane road with paved shoulders and geometric improvements, to be completed within 12 months during FY 2026-2027 on a percentage rate basis.
Who can bid: Bidders must have an average annual turnover of at least Rs. 11.81 crore over the last 3 years, and either one work of Rs. 5.91 crore (minimum 50% of estimated cost), or two works each of Rs. 4.14 crore (minimum 35% of estimated cost), or three works each of Rs. 2.95 crore (minimum 25% of estimated cost) of similar nature in the last 5 years. Bidders must be registered on the e-procurement portal (eprocure.gov.in) with a valid registration at the time of bid submission.
Key terms
- Estimated cost: Rs. 11,80,74,521/- (excl. GST)
- Bid security: Rs. 23,61,000/-
- Bid submission deadline: 06.07.2026 (17:00 Hrs)
- Bid validity: 120 days
- Contract duration: 12 months (construction period) + 12 months (DLP)
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
This document is in our archive but is not shown on our front pages: same headline as #421
The original document
National Highways & Infrastructure Development Corporation (NHIDCL)
Tender
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 1 time after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?
Discussion
No one has discussed this document yet.