NHIDCL to spend ₹5003.67 crore on 54.720 km highway package
The National Highways & Infrastructure Development Corporation Ltd (NHIDCL), under the Ministry of Road Transport & Highways, is contracting a private entity to develop, maintain, manage, and operate a 54.720 km greenfield high-speed corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam, specifically for Package-3 (from Km 78+600 to Km 133+320), on a Hybrid Annuity Basis.
Not stated in the document.
- Estimated Project Cost (Excluding GST): 5003.67 Cr
- Estimated Bid Cost (Excluding GST): 5513.50 Cr
- Bid Submission Deadline: 03.08.2026 (up to 1500 Hrs. IST)
- Bid Security: To be submitted physically within 5 working days of Bid Due Date
- Technical Bid Opening Date: 04.08.2026 (at 1500 hours IST)
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Notice
2026-06-12
Notice
2026-06-12
Notice
2026-06-12
Notice
2026-06-12
Document details
| Official title | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km). |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | active (current) |
| Year | 2026 |
| Closing date | 03-08-2026 15:00:00 |
| Documents | 4 |