कौन ज़िम्मेदार? KaunZimmedar

NHIDCL tender lists ₹0.56 crore bid security but calls it ₹58 lakh

NHIDCL is inviting bids for the slope protection, landslide mitigation, and reconstruction of a 1-km road section (km 94+745 to km 95+734) on NH-717A near Reshi border in West Bengal on an EPC (Engineering, Procurement, and Construction) basis.

The document states that eligibility and qualification criteria are prescribed in the RFP and that Joint Venture members are included in the definition of a Bidder. However, specific thresholds for minimum turnover, years of experience, or required certifications are not stated in the provided text. Bidders must submit a self-certification for local content (Class I: 50%, Class II: 20%) or be treated as Non-Local Suppliers.

  • Estimated Cost: Rs. 55.26 Crore (exclusive of GST)
  • Bid Security: Rs. 0.56 Crore (Rupees Fifty Eight Lakh Only)
  • Tender Type: International Competitive Bidding (Single stage two-part system)
  • Bid Submission Deadline: 18.07.2026, 15.00 Hrs.
  • Bid Validity: 120 days from the BID Due Date
  • Construction Period: 12 months
  • Defect Liability Period: 60 months

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-06-03
Tap “Open the PDF” above to view this document.
Notice 2026-06-03
Notice 2026-06-03
Notice 2026-06-03
Notice 2026-06-03
Corrigendum 1 2026-06-03 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 2026-06-03 scanned
Tap “Open the PDF” above to view this document.
Document details
Official titleSlope protection ,landslide mitigation and re-construction of road section (from km 94+745 to km 95+734) on NH-717A near Reshi border on EPC mode in the State of West Bengal during the FY 2026-27-2nd Call
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (current)
Year2026
Closing date06-08-2026 15:00:00
Documents7 · changed 2× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →