Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Nat’l Highways Infra Dev Corp

NHIDCL to spend ₹13.35 crore on 21.10 km NH-717A upgrade in West Bengal

The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is inviting bids for the construction and upgradation of a 21.10 km section of NH-717A from Kafer to Lava in West Bengal, including geometric improvements…

The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is inviting bids for the construction and upgradation of a 21.10 km section of NH-717A from Kafer to Lava in West Bengal, including geometric improvements, paved shoulders, and associated civil works, to be completed within 12 months during FY 2026-2027.

Who can bid: Bidders must have an average annual turnover of at least Rs. 13.35 crore over the last 3 years, or a single work of Rs. 6.68 crore (minimum 50% of estimated cost), or two similar works each of Rs. 4.67 crore (minimum 35% of estimated cost), or three similar works each of Rs. 3.34 crore (minimum 25% of estimated cost) over the last 5 years.

Key terms

  • Estimated cost: Rs. 13,34,87,922/- (exclusive of GST)
  • Security amount: Rs. 26,69,000/-
  • Bid submission deadline: 06.07.2026
  • Bid validity: 120 days
  • Contract duration: 12 months

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender

Corrigendum 1 scanned image On nhidcl.com ↗
Corrigendum 2 scanned image On nhidcl.com ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 2 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.