Balance Works for: (i) Construction of 2-Lane Specification Road with Paved Shoulders as Realignment (Greenfield Alignment) of Existing Stretch between Legship and Gyalshing of NH-510 (Design Chainage Km 58+840 to Km 75+000) under SARDP-NE Phase “A” on EPC Mode in the State of Sikkim (Package-V). (ii) Construction of 2-Lane Specification Road with Paved Shoulder as Realignment (Greenfield Alignment) of Existing Stretch between Legship to Gyalshing of NH-510 (Design Chainage from Km 75.000 to Km 90.210) under SARDP-NE Phase ”A” on EPC Mode in the State of Sikkim-(Package- VI)”
A plain-language summary isn't available for this document yet (it may be a scanned image). Read the original below.
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | 2026_NHIDC_918372_1 |
| Status | active (section: current) |
| Year | 2026 |
| Closing date | 07-09-2026 15:00:00 |
| Documents | 8 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Notice
2026-07-21
scanned
nit_13.pdf
Tap “Open the PDF” above to view this document.
Notice
2026-07-21
RFP
Notice
2026-07-21
DCA
Notice
2026-07-21
Schedules
Notice
2026-07-21
Drawings
Notice
2026-07-21
Plan and Profile Package - V
Notice
2026-07-21
Plan and Profile Package - VI (Part-1)
Notice
2026-07-21
Plan and Profile Package - VI (Part-2)
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →