कौन ज़िम्मेदार? KaunZimmedar
BrowseNHIDCL › tender

Construction of RCC Box Cell Viaduct by Cast in Situ method at chainage Km 153.150 to Km 153.350 and Km 155.850 to km 156.300 along with other ancillary works on NH-29 in the state of Nagaland under SARDP-NE through Engineering, Procurement and Construction (EPC) Contract Basis

NHIDCL closed 2025

A plain-language summary isn't available for this document yet (it may be a scanned image). Read the original below.

Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (section: award)
Year2025
Closing date
Documents1

Highlights & Points worth asking

Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.

No automated observations for this document. Read the documents below directly.

📄 Draft an RTI to ask what the documents don't say

Documents

The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.

Award 2025-01-27 scanned final-result-of-technical-evaluation-cast-in-situ-nagaland-letter-no-4078-dated-27.01.2025.pdf
Tap “Open the PDF” above to view this document.

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →