Consultancy Services as Authority’s Engineer for Supervision during O&M period for “(i) 1000 m length Viaduct at Rangpo between Km 51.10 to Km 53.90 on Sevoke-Gangtok Road, NH-10 (Old NH-31A) in the State of West Bengal/Sikkim (ii) 2-lane with paved shoulder road from km 0.000 to km 26.706 in Rhenock-Rorathang-Pakyong of NH 717-A in the state of Sikkim (iii) Two Lane “Chisopani Traffic Tunnel” of length 250m including approaches from Km 67.080 – Km 67+500 on NH-10 in East District of Sikkim (iv) 2-lane with paved shoulders road from km 0.00 to km 16.00 (Singtam-Tarku) of NH-510 in the State of
A plain-language summary isn't available for this document yet (it may be a scanned image). Read the original below.
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: award) |
| Year | 2025 |
| Closing date | — |
| Documents | 1 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Award
2025-03-10
scanned
technical-result-ae-letter-no-2813-dt-10.03.2025.pdf
Tap “Open the PDF” above to view this document.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →