कौन ज़िम्मेदार? KaunZimmedar

Pre-bid meeting set for September 15, 2026 on Nagpur bank power system

The Reserve Bank of India's Estate Department is contracting for the Design, Supply, Installation, Testing and Commissioning (DSITC) of a 2X30 KVA Uninterrupted Power Supply System in N+1 Parallel Redundant Mode, along with Comprehensive AMC, for the Bank's Main Office Building in Nagpur.

Not stated in the document.

  • Pre-bid meeting date: September 15, 2026
  • Clarifications provided on technical specifications (Output voltage Harmonic distortion)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Corrigendum 1 2026-09-18
Tap “Open the PDF” above to view this document.
Document details
Official titleMinutes of Pre-Bid Meeting - Design, Supply, Installation, Testing and Commissioning (DSITC) of 2X30 KVA Uninterrupted Power Supply System in N+1 Parallel Redundant Mode along with Comprehensive AMC for Bank's Main Office Building at Nagpur
Source bodyReserve Bank of India (RBI)
Reference number25830
StatusNone (current)
Year2026
Closing date2026-09-24
Documents1 · changed 1× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →