Strengthening of Mao to Senapati section of old NH-39 (new NH-02) from existingChainage km 212+328 (Mao Gate) to km 264+313 (Taphou Kuki) in the State of Manipur on EPC mode (Total Length 51.985 Km)
No plain-language summary yet for this document — it may be a scanned image. The original is below.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Notice
2026-09-16
scanned
Tap “Open the PDF” above to view this document.
Document details
| Official title | Strengthening of Mao to Senapati section of old NH-39 (new NH-02) from existingChainage km 212+328 (Mao Gate) to km 264+313 (Taphou Kuki) in the State of Manipur on EPC mode (Total Length 51.985 Km) |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | 2026_NHIDC_926390_1 |
| Status | None (current) |
| Year | 2026 |
| Closing date | 16-10-2026 15:00:00 |
| Documents | 1 |