कौन ज़िम्मेदार? KaunZimmedar

NHIDCL awards ₹3.91 crore road repair contract in Nagaland

NHIDCL is contracting for the short-term maintenance, restoration, and repair of Kohima Mao Road from Km. 185.540 to Km. 194.000 (excluding a section from Km 191.840 to 192.100), covering 8.200 km in Nagaland, under a Percentage Rate and Work Order Basis for FY 2026-27.

Bidders must have an average turnover of at least Rs. 78,28,287 over the last 5 years, a single work of similar nature worth at least Rs. 97,85,359 in any year during the last 5 years, and must not be blacklisted by MoRTH/NHAI/NHIDCL/State PWD/BRO. They must also have a Class-III Digital Signature Certificate with both signing and encryption components.

  • Estimated Cost: Rs. 3,91,41,437
  • Bid Security: Rs. 7,82,829
  • Tender Type: Open (e-tendering mode)
  • Bid Submission Deadline: 2026-09-08
  • Bid Validity: 120 days from Bid Due Date
  • Contract Duration: Not stated in the document

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-08-27
Tap “Open the PDF” above to view this document.
Document details
Official titleShort Term Maintenance Contract for Restoration and Repair of Kohima Mao Road from Km. 185.540 to Km. 194.000 excluding Ch. from Km 191.840 to 192.100 Length 8.200 Km in the State of Nagaland in the FY – 2026-27 - Percentage Rate and Work Order Basis
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number2026_NHIDC_923839_1
Statusclosed (archive)
Year2026
Closing date15-09-2026
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →