कौन ज़िम्मेदार? KaunZimmedar

NHIDCL to spend ₹35.67 crore on 60-month tunnel project in Jammu and Kashmir

NHIDCL is contracting for the construction of a twin tube tunnel and approach roads on NH-244 in Jammu and Kashmir under an EPC (Engineering, Procurement, Construction) contract.

Not stated in the document

  • Estimated cost: Rs. 35,67,51,000
  • Bid submission deadline: 25.10.2026
  • Bid validity: Not stated
  • Contract duration: 60 months
  • Maintenance period: 120 months

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-09-10
Tap “Open the PDF” above to view this document.
Document details
Official titleConstruction of Uni-Directional Singhpora - Vailoo Twin Tube Tunnel (Under Sinthan pass) and its approach roads on Kishtwar – Vailoo - Khanabal section of NH-244 in the Union Territory of Jammu and Kashmir on EPC mode
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number2026_NHIDC_925785_1
Statusactive (current)
Year2026
Closing date26-10-2026 11:00:00
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →