कौन ज़िम्मेदार? KaunZimmedar

NHIDCL to spend ₹42.05 crore on 30-month bridge project in Arunachal Pradesh

The National Highways & Infrastructure Development Corporation Limited (NHIDCL) is contracting the construction of a major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in Arunachal Pradesh on EPC Mode under SARDP.

Not stated in the document

  • Estimated Cost: Rs. 42.05 Crore
  • Completion + DLP: 30 months
  • Contract Duration: 60 Months
  • Bid Submission Deadline: xx/xx/2026 (up to 1500 hrs IST)
  • Bid Opening Date: xx/xx/2023 (at 1630 hrs IST)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-09-14
Tap “Open the PDF” above to view this document.
Document details
Official titleConstruction of Major bridge at Design Ch. 28+200 of Hunli-Anini Road (NH-313) in the State of Arunachal Pradesh on EPC Mode under SARDP
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number2026_NHIDC_926049_1
StatusNone (current)
Year2026
Closing date29-10-2026 15:00:00
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →