Consultancy Services for Preparation of Detailed Project Report for Construction of Major Bridge along with its approaches connecting NH-10 with NH-510 near Singtam, development of its junction and identification & realignment from Km 0+000 to Km 3+074 (S
A plain-language summary isn't available for this document yet (it may be a scanned image). Read the original below.
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: award) |
| Year | 2025 |
| Closing date | — |
| Documents | 1 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Award
2025-06-06
scanned
technical_result_dpr_singtam_tarku_letter_no2955_dt_06.06.2025.pdf
Tap “Open the PDF” above to view this document.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →