कौन ज़िम्मेदार? KaunZimmedar
BrowseNHIDCL › tender

Consultancy Services of Authority's Engineer for Improvement/Construction To 2-Lane with Paved Shoulder of old NH-40 (new NH-206) from Km 37+550 to Km 45+760 (Design Km 0+000 to Km 7+760, Design Length 7.760 Km) (Package-III) Pynursla Bypass on EPC Mode in the State of Meghalaya

NHIDCL closed 2025

A plain-language summary isn't available for this document yet (it may be a scanned image). Read the original below.

Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (section: award)
Year2025
Closing date
Documents1

Highlights & Points worth asking

Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.

No automated observations for this document. Read the documents below directly.

📄 Draft an RTI to ask what the documents don't say

Documents

The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.

Award 2025-07-10 scanned hq_nhidcl_letter_no._2917_dated_10.07.2025_regarding_result_of_techncial_evaluation_result.pdf
Tap “Open the PDF” above to view this document.

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →