कौन ज़िम्मेदार? KaunZimmedar

Independent Engineer Services for Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH-127B (near km 85.800 of NH-217) (design chainage km 0+000) and ending at existing km 108.750 of NH-217 (design chainage km 29+030) (Length= 29.030km) on Hybrid Annuity Mode

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Award 2025-08-19 scanned
Document details
Official titleIndependent Engineer Services for Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH-127B (near km 85.800 of NH-217) (design chainage km 0+000) and ending at existing km 108.750 of NH-217 (design chainage km 29+030) (Length= 29.030km) on Hybrid Annuity Mode
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (award)
Year2025
Closing date
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →