Independent Engineer Services for Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH-127B (near km 85.800 of NH-217) (design chainage km 0+000) and ending at existing km 108.750 of NH-217 (design chainage km 29+030) (Length= 29.030km) on Hybrid Annuity Mode
No plain-language summary yet for this document — it may be a scanned image. The original is below.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Award
2025-08-19
scanned
Document details
| Official title | Independent Engineer Services for Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH-127B (near km 85.800 of NH-217) (design chainage km 0+000) and ending at existing km 108.750 of NH-217 (design chainage km 29+030) (Length= 29.030km) on Hybrid Annuity Mode |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (award) |
| Year | 2025 |
| Closing date | — |
| Documents | 1 |