Consultancy services for Authority’s Engineer for Supervision of: (i) 4-Laning of NH-37 from Nagaon By-pass to Teliagaon (km 278.600 to km 288.600) in the state of Assam under SARDP-NE Phase-A on EPC mode. (ii) 4-Laning of NH-37 from Teliagaon to Rangagara (km 288.600 to km 297.000) in the state of Assam under SARDP-NE Phase-A on EPC mode. (iii) 4-Laning from Rangagara to Kaliabhor Tiniali from km 297.00 to km 315.315 of NH-37 on EPC basis. (iv) 4-Laning from Kaliabor Tinali to Dolabari section from Km 0.0 to Km 17.3 of NH 37-A including construction of new Brahmaputra bridge. (v) 4-Lane highw
A plain-language summary isn't available for this document yet (it may be a scanned image). Read the original below.
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | closed (section: award) |
| Year | 2025 |
| Closing date | — |
| Documents | 1 |
Highlights & Points worth asking
Auto-generated, neutral observations. Auto-generated from public documents. May contain errors. Not legal or financial advice. Always verify against the linked original document. KaunZimmedar is a platform, not an authority.
No automated observations for this document. Read the documents below directly.
Documents
The original government PDF is the authoritative source — shown below, or open it full-screen in a new tab.
Award
2025-10-31
scanned
nhidcl_hq_letter_no_3672_dated_31.10.2025_0.pdf
Tap “Open the PDF” above to view this document.
Discussion (0)
Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.
Open discussion (0) →