कौन ज़िम्मेदार? KaunZimmedar

Widening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call)

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Award 2026-02-12 scanned
Document details
Official titleWidening and Up-gradation of existing carriageway into 2-lane with paved shoulder from Lavamore to Start of Pedong Bypass along NH-717A from km 61.100 to km 79.700 in the State of West Bengal on EPC Mode (2nd Call)
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (award)
Year2026
Closing date
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →