NHIDCL awards erosion control work on Tripura's NH-08 after August floods

The National Highways and Infrastructure Development Corporation Ltd. (NHIDCL) is contracting restoration works for erosion control and slope protection on NH-08 section from Mungiakami to Champaknagar in Tripura, following August 2024 floods, based on a technical consultant's assessment report.

Bidders must have a minimum average annual turnover of Rs. 884.54 Lakh over the last 5 years for similar work, as stated in Clause 4.3 A (b).

  • Estimated cost: Rs. 884.54 Lacs
  • EMD/security amount: Rs. 17.69 Lacs
  • Tender type: Open (e-tendering)
  • Bid submission deadline: 2026-09-19
  • Bid validity: 120 days
  • Contract duration: Not stated in the document

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-09-09
Document details
Official titleRestoration works under “Specialized Repairs” through STMC for erosion control and slope protection at damaged stretches including landslips on various chainages on NH-08 section from Mungiakami to Champaknagar due to August 2024 floods, based on the assessment report of technical consultant NIT Agartala In the State of Tripura in the FY 2025-26 on percentage basis and work order basis (3rd Call).
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number2026_NHIDC_925283_1
Statusactive (current)
Year2026
Closing date28-09-2026 17:00:00
Documents1