NHIDCL is inviting bids for the development, maintenance, management, and operation of a 54.720 km section of a greenfield high-speed corridor (Package-3) on a Hybrid Annuity basis.
5003.67 CrThe document lists two different values for the Estimated Project Cost (Excluding GST): Rs 5003.67 Cr and Rs 5513.5…
Who can bid: The document states that the Ministry has decided to select a 'private entity' as the Bidder. Specific eligibility criteria such as minimum turnover, years of experience, or required certifications are not stated in this text.
Key terms
- Estimated Project Cost (Excluding GST): Rs 5003.67 Cr
- Estimated Project Cost (Excluding GST): Rs 5513.50 Cr
- Tender Type: Hybrid Annuity
- Bid Submission Deadline: 03.08.2026 (up to 1500 Hrs. IST)
- Technical Bid Opening: 04.08.2026 (at 1500 hours IST)
- Bid Security Submission: Physically within 5 working days of the Bid Due Date
Also in the document
- The document lists two different values for the Estimated Project Cost (Excluding GST): Rs 5003.67 Cr and Rs 5513.50 Cr.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
National Highways & Infrastructure Development Corporation (NHIDCL)
Tender · Ref. 2026_NHIDC_912874_1 · 12 Jun 2026
Read it here
Questions a citizen might ask
Observations drawn mechanically from the documents — not findings or allegations.
- The department changed this document 6 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?