Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Ma…
NHIDCL is inviting bids for the development, maintenance, management, and operation of a 54.720 km section of a greenfield high-speed corridor (Package-3) on a Hybrid Annuity basis.
The document states that the Ministry has decided to select a 'private entity' as the Bidder. Specific eligibility criteria such as minimum turnover, years of experience, or required certifications are not stated in this text.
- Estimated Project Cost (Excluding GST): Rs 5003.67 Cr
- Estimated Project Cost (Excluding GST): Rs 5513.50 Cr
- Tender Type: Hybrid Annuity
- Bid Submission Deadline: 03.08.2026 (up to 1500 Hrs. IST)
- Technical Bid Opening: 04.08.2026 (at 1500 hours IST)
- Bid Security Submission: Physically within 5 working days of the Bid Due Date
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km). |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | 2026_NHIDC_912874_1 |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 21-09-2026 |
| Documents | 7 · changed 6× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 6 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?