कौन ज़िम्मेदार? KaunZimmedar

Environmental clearance corrigendum removes MPCB consent requirement for Mumbai construction project

This document grants a corrigendum (correction) to an existing Environmental Clearance for the proposed expansion of a building/construction project at Dr. E Moses Road, Worli, Mumbai, Maharashtra.

The project proponent is Provenance Land Pvt Ltd. The clearance was granted by the Ministry of Environment, Forest and Climate Change (MOEF&CC), with the State Environment Impact Assessment Authority (SEIAA), Maharashtra, processing the application.

  • Clearance Status: Corrigendum to Environmental Clearance granted.
  • Project Category: B2 (Schedule No. 8(a) Building / Construction).
  • Location: C.S No: 1/136, 1H/136, 1K/136 & 1L/136 Dr. E Moses Road, Worli, Mumbai 400018, Maharashtra.
  • Condition: The requirement to obtain Consent for Establishment from the Maharashtra Pollution Control Board (MPCB) is removed, as per MOEF&CC OM dated January 14, 2025, stating it is not applicable and that environmental safeguards have been considered.
  • Compliance: The project must comply with all other terms and conditions stipulated in the original clearance letter.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Clearance 2026-08-05
Tap “Open the PDF” above to view this document.
Document details
Official titleEnvironment Clearance for proposed expansion at C.S No: 1/136, 1H/136, 1K/136 & 1L/136 Dr. E Moses Road, Worli, Mumbai 400018 by M/s. Provenance Land Pvt Ltd
Source bodyPARIVESH — Environmental & Forest Clearances (MoEFCC)
Reference numberSIA/MH/INFRA2/587907/2026
Statusclosed (clearance)
Year2026
Closing date
Documents1

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →