Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Environment Environment Ministry · PARIVESH

Environmental Clearance amended for Mumbai project, height for Wing A raised to 146.29 m

This document grants an amendment to the Environmental Clearance for the 'Custom Enclave' residential and commercial project located in Wadala, Mumbai, Maharashtra.

The amendment relates to the release of Total Built-Up Area (TBUA) based on a revised permissible height for Wing A.

Who it concerns: The project proponent is the Executive Engineer & Senior Manager (C), Central Public Works Department, acting on behalf of the Customs Department, Government of India. The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.

Conditions and facts

  • Clearance Status: Amendment in Environmental Clearance granted on 07/09/2026.
  • Project Area: Limited to the Total Built-Up Area (TBUA) of 2,09,917.94 m² mentioned in the previous EC dated 06.06.2023.
  • Height Revision: Amendment allows for a revised permissible height of 146.29 m for Wing A.
  • Condition: Proponent must obtain a Certified Compliance Report from the Regional Office, MoEFCC, Nagpur.
  • Condition: Proponent must obtain all mandatory NOCs and planning approvals, including conformity with local planning rules and Supreme Court orders regarding open space (RG area).
  • Condition: Underground suction tank must be located close to the existing water main, with specific clearance distances from drainage lines and STP (minimum 6m between STP and UG tank).
  • Condition: Treated sewage must meet National Green Tribunal standards (order dated 30.04.2019), and construction water usage must be for non-potable purposes only with permission.
  • Condition: Proponent must complete tree plantation within the site during the construction phase.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/MH/INFRA2/586064/2026 · 21 Jul 2026

Clearance 21 Jul 2026 · 0.7 MB Open the document On parivesh.nic.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.