कौन ज़िम्मेदार? KaunZimmedar

Corrigendum to EC for Pune precast factory, land plots unspecified

Proposed precast factory construction in Rajpuri, Taluka-Maval, District-Pune, Maharashtra, involving building construction on specified land plots.

B. G. Shirke construction technology private limited (proponent) and Ministry of Environment, Forest and Climate Change (granting authority)

  • Corrigendum to Environmental Clearance (EC) granted
  • Area/forest/land: Plot/Survey Khasra Nos. not specified
  • Capacity/size: Not specified
  • Conditions: Compliance with terms and conditions stipulated in the letter, including obtaining Consent for Establishment from MPCB as per notifications G.S.R. 702(E) and G.S.R. 703(E) dated 12.11.2024

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Clearance 2026-07-15
Tap “Open the PDF” above to view this document.
Document details
Official titleProposed Precast Factory in Gat No. 107 (P), 109, 111, 112 & 114 (P) at Rajpuri, Taluka -Maval, District – Pune, State-Maharashtra.
Source bodyPARIVESH — Environmental & Forest Clearances (MoEFCC)
Reference numberSIA/MH/INFRA2/585515/2026
Statusclosed (clearance)
Year2026
Closing date
Documents1

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →