कौन ज़िम्मेदार? KaunZimmedar

RBI campus wall project estimated at ₹2.55 crore, EMD ₹5.1 lakh

The Central Public Works Department (CPWD) of the Government of India is contracting for the reconstruction of the campus boundary wall (MDDA Side) and allied work at the RBI office campus in IT Park, Dehradun.

CPWD-registered contractors in the 'Building & Road' category, with bidding capacity equal to or greater than the estimated cost of the work (Rs. 2,55,18,796/-), calculated using the formula: Bidding Capacity = [(A x N x 1.5) - B], where A is maximum turnover in construction works over the last seven years (adjusted at 7% per annum), N is 1 (since completion period is four months), and B is value of existing commitments. Contractors must submit Form 'B' for bidding capacity.

  • Estimated cost: Rs. 2,55,18,796/-
  • EMD: Rs. 5,10,400/-
  • Time allowed: 04 months
  • Last date of online submission: 10.09.2026
  • Date of online opening: 10.09.2026

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-09-03
Tap “Open the PDF” above to view this document.
Document details
Official titleReconstruction of campus boundary wall (MDDA Side) and allied work at RBI office campus, IT Park, Dehradun
Source bodyReserve Bank of India (RBI)
Reference number25758
Statusactive (current)
Year2026
Closing date2026-09-10
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →