कौन ज़िम्मेदार? KaunZimmedar

Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km).

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-06-12 scanned
Corrigendum 1 2026-06-12 scanned
Corrigendum 2 2026-06-12 scanned
Corrigendum 3 2026-06-12 scanned
Document details
Official titleDevelopment, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-3: From Km 78+600 to Km 133+320, Design Length – 54.720 Km).
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
StatusNone (current)
Year2026
Closing date14-09-2026 15:00:00
Documents4 · changed 3× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 3 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →