Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Environment Environment Ministry · PARIVESH

Medical college hospital operational since 2023, EC granted retrospectively

This Environmental Clearance (EC) is for the construction of a new 500-bed Medical College and Hospital in Nalbari, Assam.

The project involves building hospital, academic, and residential blocks on a 17.62-hectare plot of government land.

Who it concerns: The project proponent is the Hospital Management Society, Nalbari Medical College & Hospital. The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Assam, based on recommendations from the State Expert Appraisal Committee (SEAC).

Conditions and facts

  • Clearance Status: Environmental Clearance (EC) granted under EIA Notification 2006, Category B2 (Schedule 8(a)).
  • Project Size: 500-bed hospital; Plot area 1,76,220 Sq M (17.62 Ha); Built-up area 1,17,681.14 Sq M.
  • Project Cost: Estimated at Rs. 39,763.69 Lakh.
  • Condition: Plant 4,400 saplings of specified endemic/evergreen species (e.g., Murraya paniculata, Saraca asoca) within the plot area.
  • Condition: Comply with Indian Green Building Council (IGBC), GRIHA, or LEEDS standards.
  • Condition: Manage Sewage Treatment Plants (STP 500 KLD and 300 KLD) and Effluent Treatment Plant (ETP 72 KLD) with Annual Maintenance Contracts (AMC) monitored by APCB.
  • Condition: Utilize Rs. 150 Lakh capital and Rs. 70 Lakh recurring costs for environmental safeguards as per the Environment Management Plan (EMP).
  • Condition: Submit Half-Yearly Compliance Reports (HCR) to PARIVESH 2.0 portal by June 1 and December 1.
  • Condition: Adhere to Solid Waste Management Rules, 2026.

Also in the document

  • The hospital has been operational since 2023, and the Environmental Clearance is being granted retrospectively.
  • The project site is identified as Government Land (Pub-Banbhag Mouza, Ghograpar Revenue Circle).
  • A biomedical waste incinerator is installed at the site but was noted as non-operational during the assessment.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/AS/INFRA2/587232/2026 · 4 Aug 2026

Clearance 4 Aug 2026 · 0.3 MB Open the document On parivesh.nic.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.