कौन ज़िम्मेदार? KaunZimmedar

NHIDCL to spend ₹311.85 crore widening 15.3 km Sikkim highway

NHIDCL is contracting for the widening and up-gradation of a 15.3 km stretch of NH-717B in Sikkim into a 2-lane carriageway with paved shoulders on an Engineering, Procurement, and Construction (EPC) basis.

The document invites bids from 'eligible contractors' but does not specify minimum turnover, years of experience, required certifications, or entity type requirements in the provided text.

  • Estimated Cost: Rs. 311.85 Crore (exclusive of GST)
  • Security: Rs. 3.12 Crore
  • Construction Period: 36 Months
  • Maintenance Period: 60 Months
  • Bid Submission Deadline: 06.08.2026 (upto 1500 Hrs. IST)
  • Bid Opening Date: 07.08.2026 (at 1600 hours IST)
  • Tender Type: EPC Contract

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-06-22
Tap “Open the PDF” above to view this document.
Corrigendum 1 2026-06-22 scanned
Corrigendum 2 2026-06-22 scanned
Corrigendum 3 2026-06-22
Corrigendum 4 2026-06-22 scanned
Corrigendum 5 2026-06-22 scanned
Document details
Official titleWidening and Up-gradation of existing carriageway into 2-lane with paved shoulder configuration from Rhenock (existing Km 0.000) to Rongli Bazaar (existing Km 15.300) along NH-717B in the State of Sikkim on EPC mode
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (archive)
Year2026
Closing date07-09-2026
Documents6 · changed 5× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 5 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →