कौन ज़िम्मेदार? KaunZimmedar

Independent Engineer tender lists ₹0 cost for 164 km NH-6 corridor project

NHIDCL is procuring Independent Engineer services to oversee the development, maintenance, management, and operation of a 164.355 km Greenfield High-Speed Corridor (NH-6) from Meghalaya to Assam.

The document states that the RFP is invited from 'eligible Consultants' but does not specify the detailed eligibility criteria, minimum turnover, years of experience, or required certifications in this text.

  • Tender Type: International Competitive Bidding
  • Selection Basis: QCBS (Quality and Cost Based Selection) with 60:20:20 weightage for Technical, Performance, and Financial scores
  • Bid Validity: 150 days from Bid Due Date
  • Assignment Period: 48 months (6 months development, 36 months construction, 6 months O&M)
  • Tender Fee: Rs. 5,000/- (non-refundable)
  • Bid Due Date: 03.08.2026 (2359 Hrs)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice
Tap “Open the PDF” above to view this document.
Corrigendum 1 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 2 scanned
Tap “Open the PDF” above to view this document.
Corrigendum 3 scanned
Corrigendum 4 scanned
Corrigendum 5 scanned
Corrigendum 6 scanned
Document details
Official titleIndependent Engineer Services for “Development, maintenance, management and operation of Greenfield High-Speed Corridor of 164.3550 km (NH-6) from Mawlyngkhung (near Shillong) in Meghalaya to Panchgram (near Silchar) in Assam on Hybrid Annuity Mode”.
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number2026_NHIDC_913143_1
Statusclosed (archive)
Year2026
Closing date07-09-2026
Documents7 · changed 6× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 6 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →