NHIDCL to spend ₹2,206.55 crore on 31.035 km highway section
NHIDCL is inviting bids for the development, maintenance, management, and operation of a 31.035 km section of a greenfield high-speed corridor in Meghalaya and Assam on a Hybrid Annuity basis.
The document states that a private entity will be selected as the Bidder, but specific eligibility criteria such as minimum turnover, years of experience, or required certifications are not stated in the provided text.
- Estimated Project Cost (Excluding GST): Rs 2,206.55 Cr
- Estimated Bid Project Cost (Excluding GST): Rs 2,311.50 Cr
- Tender Type: Hybrid Annuity Basis
- Bid Submission Deadline: 13.04.2026 (up to 1100 Hrs. IST)
- Technical Bid Opening Date: 14.04.2026 (at 1500 hours IST)
- Bid Security Submission Deadline: Within 5 working days of the Bid Due Date
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Development, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km) |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | 2026_NHIDC_900116_1 |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 21-09-2026 |
| Documents | 16 · changed 15× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 15 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?