Environment Environment Ministry · PARIVESH

Pune project FSI and built-up area increased in environmental clearance corrigendum

This document grants a corrigendum (correction) to the Environmental Clearance for the expansion of a residential and commercial project in Rahatani, Pune, Maharashtra.

It involves correcting specific details regarding areas, FSI, and removing certain conditions from the original clearance.

Who it concerns: The project proponent is M/s. Vardhaman Associates (represented by Prakash Bhikamchand Chajjed). The clearance was granted by the Ministry of Environment, Forest and Climate Change (MOEF&CC), based on the recommendation of the State Environment Impact Assessment Authority (SEIAA), Maharashtra.

Conditions and facts

  • Status: Corrigendum to Environmental Clearance granted.
  • Category: B1 (Townships/Area Development Projects).
  • Correction 1: Condition regarding fire tender movement and mitigation measures removed as it was not mentioned in SEAC III & SEIAA MOM.
  • Correction 2: Condition regarding revised excavation, carbon sequestration, and compensatory plantation details removed.
  • Correction 3: Condition regarding hot water capacity and solar energy savings removed.
  • Correction 4: Mandatory Green Area (RG) corrected from 1968.40 m² to 3706.70 m² on mother earth without construction.
  • Correction 5: Condition regarding planning authority ensuring compliance of SEAC point 3 before commencement certificate removed.
  • Correction 6: Condition regarding fire department ensuring fire tender movement prior to commencement certificate removed.
  • Correction 7: FSI corrected from 92910.70 m² (Non FSI 72350.89 m², Total BUA 165261.59 m²) to 150592.50 m² (Non FSI 76692.01 m², Total BUA 227284.51 m²) as per IOD Sanction plan.

Also in the document

  • The corrigendum removes several conditions originally imposed, stating they were not mentioned in the SEAC III & SEIAA MOM.
  • The Floor Space Index (FSI) and Total Built-Up Area (BUA) figures were significantly increased in the corrigendum compared to the original clearance.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/MH/INFRA2/584567/2026 · 7 Jul 2026

Clearance 7 Jul 2026 · 0.6 MB Open the document On parivesh.nic.in ↗
Read it here