Environmental Clearance corrigendum removes MPCB consent requirement for Pune township project
This document grants a corrigendum (correction) to the Environmental Clearance for the expansion of a proposed integrated township in villages Mhalunge, Maan, Hinjewadi, and Nande Tal in Pune district, Maharashtra.
The project proponents are Mhalunge Land Developers Pvt. Ltd. & Ashadan Township Ventures Pvt. Ltd. The clearance was granted by the Ministry of Environment, Forest and Climate Change (MOEF&CC), with the letter issued by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.
- Clearance Status: Corrigendum to Environmental Clearance granted.
- Category: B1 (Townships/Area Development Projects).
- Correction: The requirement to obtain 'Consent for Establishment' from the Maharashtra Pollution Control Board (MPCB) is removed.
- Reason for Correction: As per MOEF&CC Office Memorandum dated January 14, 2025, Consent to Establishment is not applicable, and environmental safeguards from the State Pollution Control Board (SPCB) have been considered.
- Condition: Compliance with all other terms and conditions stipulated in the original clearance letter dated 09/07/2026 is required.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Clearance
2026-07-09
Tap “Open the PDF” above to view this document.
Document details
| Official title | Expansion in Proposed Integrated Township at Village Mhalunge, Maan , Hinjewadi and Nande Tal – Mulshi, Dist. Pune by Mhalunge Land Developers Pvt. Ltd. & Ashadan Township ventures Pvt. Ltd. |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | SIA/MH/INFRA2/584835/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |