Performance Based Maintenance Contracts (PBMC) for Strengthening and Maintenance on (i) NH-7…
NHIDCL is inviting bids for the slope protection, landslide mitigation, and reconstruction of a 1-km road section (km 94+745 to km 95+734) on NH-717A near Reshi border in West Bengal, including a 60-month defect liability period.
The document text provided does not specify the minimum turnover, years of experience, or specific certifications required for eligibility. It states that bidders must submit a self-certification for local content (Class I: min 50%, Class II: min 20%) and that Joint Ventures are permitted.
- Estimated Cost: Rs. 55.26 Crore (exclusive of GST)
- Bid Security: Rs. 0.56 Crore (Rupees Fifty Six Lakh Only)
- Tender Type: International Competitive Bidding (Single stage two-part system)
- Bid Submission Deadline: 18.07.2026, 15.00 Hrs.
- Bid Validity: 120 days from BID Due Date
- Construction Period: 12 months
- Defect Liability Period: 60 months
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Document details
| Official title | Performance Based Maintenance Contracts (PBMC) for Strengthening and Maintenance on (i) NH-717 for highway starting from its junction with NH-17 near Baradighi connecting NH-27 near Mainaguri, Cangrabandha and terminating at Indo/Bangladesh Border in the State of West Bengal and (ii) NH-317A for highway starting from its junction with NH-317 near Hasimara connecting Jaigaon and terminating at Indo/Bhutan Border in the state of West Bengal during the FY 2026-2027 (3rd Call). |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | 2026_NHIDC_920310_1 |
| Status | closed (archive) |
| Year | 2026 |
| Closing date | 24-08-2026 |
| Documents | 3 · changed 2× after publishing |
Observations & questions a citizen might ask
Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.
- The department changed this document 2 times after first publishing it.
- What prompted each amendment, and was the closing date extended to give bidders time to respond?
- Do the eligibility and scope requirements match the stated purpose and estimated value?
- Were all amendments published on the portal before the deadline?