NHIDCL to spend ₹2,206.55 crore on 31.035 km highway package

The National Highways & Infrastructure Development Corporation Limited (NHIDCL) is contracting a private entity to develop, maintain, manage, and operate a 31.035 km greenfield high-speed corridor from Km 133+320 to Km 164+355 (Package-4) on a Hybrid Annuity Basis, connecting Mawlyngkhung near Shillong in Meghalaya to Panchgram near Silchar in Assam with 4-laning and paved shoulders.

Not stated in the document

  • Estimated Project Cost (Excluding GST): Rs 2,206.55 Cr
  • Estimated Bid Cost (Excluding GST): Rs 2,311.50 Cr
  • Bid Submission Deadline: 13.04.2026 (up to 1100 Hrs. IST)
  • Bid Security: To be submitted physically within 5-working days of Bid Due Date
  • Technical Bid Opening: 14.04.2026 (at 1500 hours IST)

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2026-02-25
Corrigendum 1 2026-02-25 scanned
Corrigendum 2 2026-02-25 scanned
Corrigendum 3 2026-02-25 scanned
Corrigendum 4 2026-02-25 scanned
Corrigendum 5 2026-02-25 scanned
Corrigendum 6 2026-02-25 scanned
Corrigendum 7 2026-02-25 scanned
Corrigendum 8 2026-02-25 scanned
Document details
Official titleDevelopment, Maintenance, Management and Operation of Greenfield High-Speed Corridor from Mawlyngkhung (Near Shillong) in Meghalaya to Panchgram (Near Silchar) in Assam by 4-Laning with Paved Shoulders on Hybrid Annuity Basis. (Package-4: From Km 133+320 to Km 164+355, Design Length – 31.035 Km)
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
Statusclosed (current)
Year2026
Closing date20-08-2026 15:00:00
Documents9 · changed 8× after publishing
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • The department changed this document 8 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?