Sunday, 8 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Nat’l Highways Infra Dev Corp

NHIDCL reissues bid for West Bengal road project after initial call

NHIDCL is inviting bids for the slope protection, landslide mitigation, and reconstruction of a 1-km road section (km 94+745 to km 95+734) on NH-717A near Reshi border in West Bengal on an EPC (Engineering, Procurement, and Construction)…

NHIDCL is inviting bids for the slope protection, landslide mitigation, and reconstruction of a 1-km road section (km 94+745 to km 95+734) on NH-717A near Reshi border in West Bengal on an EPC (Engineering, Procurement, and Construction) basis.

Who can bid: The document states that eligibility and qualification criteria are prescribed in the RFP and will be examined under the Technical Bid, but specific thresholds (such as minimum turnover, years of experience, or required certifications) are not stated in the provided text. Bidders must submit a self-certification for local content (Class I: min 50%, Class II: min 20%) or be treated as Non-Local Suppliers. Joint Ventures are mentioned as eligible entities.

Key terms

  • Estimated Cost: Rs. 55.26 Crore (exclusive of GST)
  • Bid Security: Rs. 0.56 Crore (Rupees Fifty Eight Lakh Only)
  • Tender Type: International Competitive Bidding (Single stage two-part system)
  • Bid Submission Deadline: 18.07.2026, 15.00 Hrs.
  • Bid Validity: 120 days from the BID Due Date
  • Construction Period: 12 months
  • Defect Liability Period: 60 months

Also in the document

  • This is the '2nd Call' for the project, indicating a previous bidding process may have occurred.
  • The bid security amount (Rs. 0.56 Crore) is approximately 1% of the estimated project cost.
  • Bidders must submit the Bid Security specifically as an Electronic Bank Guarantee (e-Bank Guarantee) via the SFMS Gateway; other forms are not acceptable.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

⚠ Figures not confirmed. Our automated check could not find every number in this summary in the document. Treat the figures with care and check the original.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

This document is in our archive but is not shown on our front pages: a number in the summary could not be found in the document.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender · 3 Jun 2026

Notice 3 Jun 2026 · 0.5 MB Open the document On nhidcl.com ↗
Corrigendum 1 3 Jun 2026 · scanned image · 0.5 MB Open the document On nhidcl.com ↗
Corrigendum 2 3 Jun 2026 · scanned image · 0.6 MB Open the document On nhidcl.com ↗
Corrigendum 3 3 Jun 2026 · 14.2 MB Open the document On nhidcl.com ↗
Corrigendum 4 3 Jun 2026 · scanned image · 0.6 MB Open the document On nhidcl.com ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 4 times after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.