Nat’l Highways Infra Dev Corp

NHIDCL highway project estimated at ₹99.94 lakh with ₹0.99946 lakh bid security

NHIDCL is contracting for the maintenance of a road section from Churachandpur to Tipaimukh on NH-02 in Manipur, covering 70.00 km to 185.00 km, on an item-rate and work-order basis under the risk and cost of the EPC Contractor.

Who can bid: Bidders must have an average turnover of Rs. 99.94 lakh over the last 5 years, a single work of similar nature worth Rs. 39.97 lakh in any year during the last 5 years, and must complete work within 3 months. Bidders must not be blacklisted by MoRTH/NHAI/NHIDCL/State PWD/BRO.

Key terms

  • Estimated cost: Rs. 99.94 lakh
  • Bid security: Rs. 0.99946 lakh
  • Tender type: Open (e-tendering)
  • Bid submission deadline: 2026-07-13
  • Bid validity: 120 days
  • Contract duration: Not stated

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender · Ref. 2026_NHIDC_921000_1 · 6 Aug 2026

Notice 6 Aug 2026 · 0.4 MB Open the document On nhidcl.com ↗
Corrigendum 1 6 Aug 2026 · scanned image · 0.2 MB Open the document On nhidcl.com ↗
Read it here
Questions a citizen might ask

Observations drawn mechanically from the documents — not findings or allegations.

  • The department changed this document 1 time after first publishing it.
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?