कौन ज़िम्मेदार? KaunZimmedar

RFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Package-I) in the state of Arunachal Pradesh on EPC mode. (ii) Improvement and Widening to two lane with Paved Shoulder of NH-15 (Old NH-52) from Existing Km 770.600 (Design Km 24.819) to Existing km 805.750 (Design Km 59.885) (Kamlang T-Junction to Cho

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Award 2025-01-28 scanned
Document details
Official titleRFP for Consultancy services as Authority’s Engineer for Supervision of: (i) Improvement and Widening to two lane with Paved Shoulder of NH-13 & 15 (Old NH-52) from Existing Km 745.60 (Design Km 0.000) to Existing km 770.600 (Design Km 24.819) (Brahmakund T-junction to Kamlang T-Junction, Existing Length: 25.00 Km, Design Length: 24.819 Km, Package-I) in the state of Arunachal Pradesh on EPC mode. (ii) Improvement and Widening to two lane with Paved Shoulder of NH-15 (Old NH-52) from Existing Km 770.600 (Design Km 24.819) to Existing km 805.750 (Design Km 59.885) (Kamlang T-Junction to Cho
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
StatusNone (award)
Year2025
Closing date
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →