कौन ज़िम्मेदार? KaunZimmedar

Widening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) Mode – Balance Works & Rectification Works

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Award 2025-01-31 scanned
Document details
Official titleWidening to 2 (Two) Lane with Paved Shoulder of Imphal to Jiribam section of NH-37 from Design Chainage km 15.940 to km 33.120 (Existing Chainage km 15.946 to km 33.955) (Length = 17.180 km) (PKG-2) in the State of Manipur on Engineering, Procurement & Construction (EPC) Mode – Balance Works & Rectification Works
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
StatusNone (award)
Year2025
Closing date
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →