कौन ज़िम्मेदार? KaunZimmedar

Consultancy services for preparation of Detailed ProjectReport and Pre-construction activities in respect ofconstruction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking /

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Award 2025-06-06 scanned
Document details
Official titleConsultancy services for preparation of Detailed ProjectReport and Pre-construction activities in respect ofconstruction/ widening of existing carriageway into 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking /
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
StatusNone (award)
Year2025
Closing date
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →