Sunday, 8 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Nat’l Highways Infra Dev Corp

Independent Engineer Services for Construction to 2-Lane with Paved Shoulder of Tura Bypass between Existing km 57.500 of NH-127B (near km 85.800 of NH-217) (design chainage km 0+000) and ending at existing km 108.750 of NH-217 (design chainage km 29+030) (Length= 29.030km) on Hybrid Annuity Mode

We have not written this document up yet — it appears to be a scanned image that our software cannot read. The original is below, and it is the authority.

How this was written

This document is in our archive but is not shown on our front pages: we have not written it up yet.

How we work · Report an error in this story

The original document

National Highways & Infrastructure Development Corporation (NHIDCL)

Tender · 19 Aug 2025

Award 19 Aug 2025 · scanned image On nhidcl.com ↗

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.