कौन ज़िम्मेदार? KaunZimmedar

Construction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design chainage Km 0+000) and ending at existing Km 108+750 of NH217 (Design chainage Km 29+030) (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya.

No plain-language summary yet for this document — it may be a scanned image. The original is below.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Award 2026-02-11 scanned
Document details
Official titleConstruction to 2-Lane with Paved Shoulder of Tura Bypass starting from existing Km 57+500 of NH-127B (Design chainage Km 0+000) and ending at existing Km 108+750 of NH217 (Design chainage Km 29+030) (Length-29.030 Km) on Hybrid Annuity Mode in the state of Meghalaya.
Source bodyNational Highways & Infrastructure Development Corporation (NHIDCL)
Reference number
StatusNone (award)
Year2026
Closing date
Documents1

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →