Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode
No plain-language summary yet for this document — it may be a scanned image. The original is below.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Award
2026-02-11
scanned
Document details
| Official title | Construction of balance work of Bi-directional Tunnel at Km 83rd and a Major Bridge between Km 82+675 and Km 82+925 on NH-244 in the UT of J&K on EPC mode |
| Source body | National Highways & Infrastructure Development Corporation (NHIDCL) |
| Reference number | — |
| Status | None (award) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |