कौन ज़िम्मेदार? KaunZimmedar

Environmental Clearance Corrigendum Granted for Pune Project, Not New Approval

This document grants a corrigendum (correction) to the Environmental Clearance for the proposed expansion of a residential and commercial project. The project is located in Boradewadi, Moshi, Taluka Haveli, District Pune, Maharashtra.

The project proponent is M/s. Chopra Kakde Realty LLP. The clearance was granted by the Ministry of Environment, Forest and Climate Change (MOEF&CC), with the State Environment Impact Assessment Authority (SEIAA), Maharashtra, processing the application.

  • The document is a grant of a corrigendum to an existing Environmental Clearance (EC), not a new clearance.
  • The project falls under Category B2 and Schedule No. 8(a) (Building/Construction).
  • The specific details of the correction sought are listed in a table in the original document but are not fully legible in the provided text (referenced as 'Details of corrigendum sought').
  • The corrigendum is subject to compliance with the terms and conditions stipulated in the original clearance letter dated 15/06/2026.
  • The Unique Identification Number for the clearance is EC26C3801MH5439308N.

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Clearance 2026-06-15
Tap “Open the PDF” above to view this document.
Document details
Official titleProposed Expansion of Residential & Commercial Project Located at Survey. No. 674, 686, 687 near woodvilla phase-3, Boradewadi, Moshi, Taluka Haveli. District Pune, Maharashtra by M/s. Chopra Kakde Realty LLP
Source bodyPARIVESH — Environmental & Forest Clearances (MoEFCC)
Reference numberSIA/MH/INFRA2/581677/2026
Statusclosed (clearance)
Year2026
Closing date
Documents1

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →