Saturday, 7 November 2026 कौन ज़िम्मेदार?
कौन ज़िम्मेदार?KaunZimmedar

Every story is a real government document.

Environment Environment Ministry · PARIVESH

Environmental Clearance grants project with mandate to replace 'Prajakta' tree with indigenous species

This document grants Environmental Clearance (EC) for a proposed residential project located at Survey No. 103/3A & 103/3B in Ravet, Taluka Haveli, District Pune, Maharashtra.

The project involves building/construction activities with a total construction area of 77,178.57 square meters.

Who it concerns: The project proponent is H S Associates. The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Maharashtra.

Conditions and facts

  • Clearance Status: Environmental Clearance (EC) granted under EIA Notification 2006, Category B2.
  • Project Size: Total Construction Area is 77,178.57 Sq.m.
  • Condition: Proponent must obtain all mandatory NOCs and plan approvals from the local planning authority.
  • Condition: Proponent must replace the 'Prajakta' tree with other indigenous tree species.
  • Condition: Proponent must implement a plan to make the project a plastic-free zone.
  • Condition: Treated sewage must meet parameters set by the National Green Tribunal order dated 30.04.2019.
  • Condition: Construction phase water usage must not be drinking water.
  • Condition: Construction and demolition waste must be managed as per the 2016 Rules.
  • Condition: Electric vehicle charging facilities must be provided as per the Maharashtra Electric Vehicle Policy, 2025.
  • Condition: Minimum 5% energy saving must be achieved using non-conventional energy sources.

Also in the document

  • The clearance specifically requires the replacement of a 'Prajakta' tree with indigenous species.
  • The project is mandated to be a 'plastic-free zone'.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/MH/INFRA2/582751/2026 · 20 Jun 2026

Clearance 20 Jun 2026 · 2.0 MB Open the document On parivesh.nic.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.