Block-B Expansion OCP project to boost road coal transport to 2 MTPA
This document concerns an amendment to the Environmental Clearance for the Block-B Expansion Open Cast Coal Mine (OCP) project in Singrauli district, Madhya Pradesh. The project involves coal mining with a production capacity of 10 MTPA within a lease area of 1500.688 hectares.
The project proponent is M/s. Northern Coalfields Limited (NCL). The clearance is being processed by the Ministry of Environment, Forest and Climate Change (MoEF&CC), IA Division.
- Clearance Status: Amendment in Environmental Clearance (EC) sought for the EC dated 14/05/2025.
- Project Capacity: 10 MTPA (Million Tonnes Per Annum).
- Lease Area: 1500.688 hectares.
- Location: Villages Audhiya and PO Gorbi, Tehsil Chitrangi, District Singrauli, Madhya Pradesh.
- Condition Amendment 1 (Coal Handling Plant): Completion deadline extended from March 2026 to March 2027 due to contractor failure.
- Condition Amendment 2 (Transport Mode): Change in coal dispatch mode from 9 MTPA via Rail/1 MTPA via Road to 8 MTPA via Rail/2 MTPA via Road.
- Condition Amendment 3 (Renewable Energy): Requirement to install solar power generation units and submit compliance status, replacing the previous emphasis on using renewable energy instead of grid/thermal power.
- Condition Amendment 4 (Star Rating): Request to amend the mandatory 5-Star Rating condition from the Ministry of Coal guidelines, citing operational variables.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Clearance
2026-06-24
Tap “Open the PDF” above to view this document.
Document details
| Official title | Block-B Expansion OCP Project |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | IA/MP/CMIN/578188/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |