Musi Riverfront Project: 639 structures to be impacted, 2,660 trees affected

This document grants prior Environmental Clearance for the Musi Riverfront Development Project (Phase 1A and 1B) in Hyderabad, Telangana.

The project involves a 20.5 km riverfront corridor development including flood protection, sewerage infrastructure, roads, promenades, and ecological restoration.

Who it concerns: The project proponent is Musi Riverfront Development Corporation Limited (MRDCL). The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Telangana.

Conditions and facts

  • Clearance Status: Fresh Environmental Clearance (EC) granted under Category B1.
  • Project Area: 199.89 hectares covering Phase 1A (9.2 km) and Phase 1B (11.3 km) from Osman Sagar/Himayat Sagar to Bapughat.
  • Cost: Total project cost is Rs. 7055 crores (Phase 1A: Rs. 3105 crores; Phase 1B: Rs. 3950 crores).
  • Conditions: Implementation of Rehabilitation & Resettlement (R&R) for approximately 639 structures under RFCTLARR Act, 2013.
  • Conditions: Tree management including minimization of felling, transplantation where feasible, and compensatory plantation at a 1:10 ratio using native species.
  • Conditions: Wastewater management via integrated sewerage system connected to existing STPs, with 100% collection and treatment.
  • Conditions: Compliance with Solid Waste Management Rules and use of authorized agencies for disposal.

Also in the document

  • The project involves the removal or impact on approximately 639 permanent and temporary structures, requiring rehabilitation and resettlement.
  • Approximately 2,660 trees are likely to be affected, necessitating compensatory plantation at a 1:10 ratio.
  • The project includes the construction of 7 rubber check dams and extensive sewerage infrastructure with a projected demand of 334.4 MLD.

How this was written

An AI model running on our own computer read the government document and wrote this summary. No person has checked it.

✓ Figures checked. Every number in this summary was found in the document by an automated check.

That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.

How we work · Report an error in this story

The original document

PARIVESH — Environmental & Forest Clearances (MoEFCC)

Clearance · Ref. SIA/TG/INFRA2/583025/2026 · 27 Jun 2026

Clearance 27 Jun 2026 · 0.4 MB Open the document On parivesh.nic.in ↗
Read it here

Discussion

Discuss the documents, not people. No doxxing of private individuals. Do not state allegations of crime or wrongdoing as fact — ask questions instead. Be civil. Posts that break these rules may be removed by moderators.

Sign in with Google to post

No one has discussed this document yet.