₹10 lakh set aside for Tiger Reserve consultation in Assam stadium project
This clearance is for the construction of an open stadium at the Amingaon Sports Complex in Kamrup, Assam. The project involves building cricket stadium wings, coach accommodations, player hostels, and service blocks on a plot of approximately 57,487 square meters.
The project proponent is Santanu Kumar Nath. The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Assam, based on recommendations from the State Expert Appraisal Committee (SEAC).
- Environmental Clearance (EC) granted under EIA Notification 2006, Category B2, Schedule 8(a).
- Plot area is 57,487.70 Sq M; built-up area is 38,125.13 Sq M.
- Total estimated project cost is INR 380.66 Crore.
- A Green Belt of 19,744.56 Sq M (34.34% of plot area) must be established with 2,500 trees.
- A Sewage Treatment Plant (STP) of 250 KLD capacity is required.
- Proponent must comply with IGBC, GRIHA, or LEEDS green building standards.
- Environmental Management Plan (EMP) costs of Rs. 150 Lakh (capital) and Rs. 60 Lakh (recurring) must be utilized and reported.
- Consent to Operate (CTO) from Assam Pollution Control Board is required before construction starts.
- Half-Yearly Compliance Reports (HCR) must be uploaded to the PARIVESH 2.0 portal by June 1 and December 1.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Clearance
2026-06-30
Tap “Open the PDF” above to view this document.
Document details
| Official title | Construction of Open Stadium at Amingaon Sports Complex Kamrup, Assam |
| Source body | PARIVESH — Environmental & Forest Clearances (MoEFCC) |
| Reference number | SIA/AS/INFRA2/576180/2026 |
| Status | closed (clearance) |
| Year | 2026 |
| Closing date | — |
| Documents | 1 |