Renewable energy meets 51.5% of electricity demand on 29 July 2025
The question asked by Shri Ve Vaithilingam and Thiru Dr. S Jagathratchakan was about challenges and measures related to rising electricity demand, answered by the Ministry of Power.
Shri Ve Vaithilingam, Thiru Dr. S Jagathratchakan (asked); Ministry of Power (answered)
- 548.86 GW installed generation capacity as on June 2026
- 324.7 GW of generation capacity added since April 2014
- 2,18,267 ckm of Transmission lines added since 2014
- 9,47,405 MVA of Transformation capacity added since 2014
- 84,390 MW of Inter-Regional capacity added since 2014
- All-India peak demand of 270.8 GW met in May 2026
- All-India peak demand exceeded 270 GW twice in July 2026
- 103.7 GW Variable Renewable Energy (VRE) generation in July 2026
- Coal-based generation capacity: 230.8 GW
- Coal stock at Thermal Power Plants: 41.4 MT (sufficient for 13 days at 85% PLF)
- Gas-based generation: less than 2%
- 18,374 villages electrified under DDUGJY
- 2.86 crore households electrified under SAUBHAGYA
- Average hours of supply in rural areas: 22.6 hours in FY26
- AT&C loss reduced from 22.62% in FY14 to 15.04% in FY25
- Gap between ACS and ARR narrowed from ₹0.78 to ₹0.06 per unit in FY25
- Renewable energy share in electricity generation: 51.5% on 29 July 2025
- 64,695 MW capacity addition in 2025-26 (50,905 MW from renewable)
- India's national transmission network: 5.08 lakh ckm of transmission lines
- Energy shortage declined to 0.0% in FY2025-26
- NDC goal of 50% non-fossil fuel capacity achieved in 2025 (5 years ahead of 2030)
- 500 GW non-fossil fuel capacity target by 2030
- 786 GW non-fossil fuel capacity projected by 2035-36
- 315 GW coal-based capacity target by 2035-36
- 100 GW nuclear power capacity target by 2047
- 80 GW BESS and 94 GW PSP capacity projected by 2035-36
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Parliamentary Q&A
23.07.2026
Tap “Open the PDF” above to view this document.
Document details
| Official title | Rising Electricity Demand |
| Source body | Parliament of India — Questions & Answers (Lok Sabha, starred) |
| Reference number | LS Q73 (Session 8) |
| Status | closed (question) |
| Year | 23.0 |
| Closing date | — |
| Documents | 1 |