PMGSY-IV targets 25,000 unconnected habitations with ₹70,125 crore outlay
The question asked for details on unconnected habitations targeted under PMGSY-IV, budget allocations, specific data for the Sidhi constituency, road repair policies, and contractor maintenance obligations. It was addressed to the Ministry of Rural Development.
Asked by Dr. Rajesh Mishra; Answered by the Ministry of Rural Development (Minister Shri Shivraj Singh Chouhan).
- PMGSY-IV targets 25,000 eligible unconnected habitations with 62,500 km of road construction.
- Total outlay for PMGSY-IV is Rs. 70,125 crore for FY 2024–25 to FY 2028–29.
- There is no state-wise target under PMGSY-IV; eligibility is based on Census 2011 population norms (500+ in plains, 250+ in Special Category States, 100+ in LWE affected districts).
- In Sidhi Lok Sabha Constituency, 994 habitations were identified/surveyed, with 968 verified by NRIDA.
- Proposals for 31 road works (64.90 km, Rs. 42.95 crore) in Sidhi were approved on 15.05.2026.
- Routine maintenance beyond the 5-year Defect Liability Period (DLP) is the responsibility of State Governments, with a mandatory 10-year maintenance commitment via MoU.
- Contractors are mandatorily required to maintain roads for a 5-year DLP, with payments linked to performance-based monitoring via the e-MARG portal.
Written from the document by AI, and checked against it. The original below is authoritative.
The original document
Parliamentary Q&A
28.07.2026
Tap “Open the PDF” above to view this document.
Document details
| Official title | Unconnected Habitations under PMGSY-IV |
| Source body | Parliament of India — Questions & Answers (Lok Sabha, starred) |
| Reference number | LS Q121 (Session 8) |
| Status | closed (question) |
| Year | 28.0 |
| Closing date | — |
| Documents | 1 |