कौन ज़िम्मेदार? KaunZimmedar

CBSE contract for Gurgaon shed sets EMD at ₹10,000

The Central Board of Secondary Education (CBSE) is contracting for the provision and fixing of an ACP Sheet Shed at NICPD, 76G, Sec-18, Gurgaon, including fabrication, supply, and installation of aluminium composite panels, steel trusses, and concrete work.

Not stated in the document

  • Estimated/contract value: not stated
  • EMD/security amount: Rs. 10000/-
  • Tender type: not stated
  • Bid submission deadline: 17.03.2014
  • Bid validity: not stated
  • Contract duration: 5 days from issue of work order

Written from the document by AI, and checked against it. The original below is authoritative.

The original document

Notice 2014-01-01
Tap “Open the PDF” above to view this document.
Document details
Official titleProviding and Fixing of ACP Sheet Shed at NICPD, 76G, Sec-18, Gurgaon.
Source bodyCentral Board of Secondary Education (CBSE)
Reference number
Statusclosed (academic_archive)
Year2014
Closing date2014-03-17
Documents1
Observations & questions a citizen might ask

Factual observations drawn mechanically from the documents — not findings or allegations. Verify each against the original.

  • A corrigendum changed “specifications” from “ACP sheet shall be Alstone/Alu Decor.” to “aluminium composite panel cladding in metallic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour and shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc.” (corrigendum dated 2014-01-01).
  • What prompted each amendment, and was the closing date extended to give bidders time to respond?
  • Do the eligibility and scope requirements match the stated purpose and estimated value?
  • Were all amendments published on the portal before the deadline?

📄 Draft an RTI to ask what the documents don't say

Discussion (0)

Citizens discussing these documents. A discussion space — nothing here is verified fact or an official finding. Reading is free; sign in to take part.

Open discussion (0) →