This document grants prior Environmental Clearance for the 'Oyster Walk Group Housing Project', a township/area development project located in Ghaziabad district, Uttar Pradesh.
The project involves the construction of group housing at Plot Number GH-2C, Oakwood Enclave, Sector-1, Wave City.
Who it concerns: The project proponent is M/s SRSD Infrastructure Venture LLP (represented by Shri Shakti Saxena). The clearance was granted by the State Environment Impact Assessment Authority (SEIAA), Uttar Pradesh, based on recommendations from the State Expert Appraisal Committee (SEAC).
Conditions and facts
- Clearance Status: Fresh Environmental Clearance (Category B1) granted on 17/07/2026.
- Project Type: Townships/Area Development Projects.
- Condition: Install solar power plant to meet 5% of total electricity requirements before operations commence.
- Condition: Prepare and implement a dewatering plan for basement excavation and a comprehensive stormwater management plan.
- Condition: Conduct a comprehensive social impact assessment and implement a redressal plan.
- Condition: Provide a Sewage Treatment Plant (STP) with tertiary treatment and a dual pipeline system for water reuse.
- Condition: Develop a green belt as per CPCB norms and plant Golden Bamboo, shrubs, and vertical gardens.
- Condition: Invest 1.5% of the project cost in Corporate Environmental Responsibility (CER) activities.
- Condition: Use only BEE 4- or 5-star appliances and LED lighting; provide electric vehicle charging facilities.
- Condition: Deploy anti-smog guns during construction as per Supreme Court directions.
Also in the document
- The project is exempted from obtaining 'Consent to Establish' from the Pollution Control Board due to MoEF&CC Notifications dated 12.11.2024, but must still obtain prescribed environmental safeguards.
- The clearance is conditional on the site not being part of any no-development zone, buffer zone, wetland, or no-activity zone; violation results in automatic cancellation.
- The project proponent is required to conduct a structural audit of the building once every 5 years by an expert institution.
How this was written
An AI model running on our own computer read the government document and wrote this summary. No person has checked it.
✓ Figures checked. Every number in this summary was found in the document by an automated check.
That check compares numbers only. It cannot confirm that the wording says what the document says — so the original document is always the authority.
The original document
PARIVESH — Environmental & Forest Clearances (MoEFCC)
Clearance · Ref. SIA/UP/INFRA2/576038/2026 · 16 May 2026
Read it here
Discussion
No one has discussed this document yet.